[Presenting Construction Case Studies] TDR Shot Lightning System
Corresponds to various sharp curves! Secondary lining construction system for shield steel segment sections.
We would like to introduce a case study of the "TDR Shot Lightning System." This method can easily accommodate special shapes and structures. It can fill every corner of the steel segments, achieving high density. In the sewer pipe and machine remnants (underground joints) of the second Toyama trunk line construction, it was applied with a finished inner diameter of 2400mm and a total length of 20m. 【Features of the Method】 ■ Accommodates various sharp curves ■ Easily adapts to special shapes and structures ■ Materials can be selected according to the tunnel's purpose ■ Fast construction speed ■ Easy maintenance ■ Excellent economic efficiency and shortened construction period *For more details, please refer to the PDF materials or feel free to contact us.
- Company:エムシーエム 北陸センター
- Price:Other